The mayor of Águilas, Mari Carmen Moreno, and the Town Planning mayor, Tomás Consentino, recently visited the different works, included in the Works and Services Plan (POS), which are being carried out in the town and which has a investment close to 245,000 euros.
Specifically, Moreno and Consentino were supervising the works that are being carried out in Manuel Azaña and Juan Mula streets, aimed at solving the existing problems with stormwater drainage.
In the area a water collector with its corresponding scuppers is being built, the sewerage of wastewater and the drinking water network will be renewed and the pavement will be replaced with asphalt agglomerate.
Source: Ayuntamiento de Águilas